﻿<?xml version="1.0" encoding="utf-8"?>
<rdf:Description rdf:about="https://calm.abdn.ac.uk:443/archives/record/catalog/MS%204022/2/1/4" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <dc:title>Murchison Field Development Platform Structure - Preliminary Launch Barge Study</dc:title>
  <dc:description>Report of a preliminary study of options for safe launching the Murchison jacket from a barge into the sea, in the absence of an existing barge capable of launching a structure of its size and weight. The study investigates the ballasting requirements for safely launching the jacket from each of two smaller barges that were to be available at the time of the installation.</dc:description>
  <dc:date>December 1976</dc:date>
</rdf:Description>