﻿<?xml version="1.0" encoding="utf-8"?>
<rdf:Description rdf:about="https://calm.abdn.ac.uk:443/archives/record/catalog/MS%203801/3/2/6" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <dc:title>Frigg Field Project. Design Manual Volume 2: Pipeline. Book 15: Submersibles.</dc:title>
  <dc:description>Apart from the introduction, the bulk of this book is extracted from the 'Submersible Season Report - 1976', comprising chapters on technical specifications; pipeline inspection; buoy release; MCP-01 site clearance; pull-in operation assistance; MCP-01 base inspection; pulling-head inspection; deep valley inspection; pipe buckle surveys; transponder launch and recovery; submersible performance; and conclusion. The logs, statistics and results from the work carried out are presented. With diagrams and charts.</dc:description>
  <dc:date>1976 - 1977</dc:date>
</rdf:Description>