Hierarchy Browser

Skip Navigation Links.
Collapse MS 4022 - Murchison North Sea Oil Field papersMS 4022 - Murchison North Sea Oil Field papers
Expand 1 - Management and Administration1 - Management and Administration
Collapse 2 - Engineering and Construction2 - Engineering and Construction
Expand 1 - Engineering and Construction: Pre-installation Studies and Reports1 - Engineering and Construction: Pre-installation Studies and Reports
Expand 2 - Engineering and Construction: Installation Manuals and Procedures2 - Engineering and Construction: Installation Manuals and Procedures
Expand 3 - Engineering and Construction: Engineering Specifications3 - Engineering and Construction: Engineering Specifications
Expand 4 - Engineering and Construction: Engineering Reports and Manuals4 - Engineering and Construction: Engineering Reports and Manuals
Expand 5 - Engineering and Construction: Photographs5 - Engineering and Construction: Photographs
Collapse 6 - Plans and Drawings6 - Plans and Drawings
Expand 1 - Accommodation Modules1 - Accommodation Modules
Expand 2 - Drilling2 - Drilling
Expand 3 - Health and Safety3 - Health and Safety
Expand 4 - Heating and Ventilation4 - Heating and Ventilation
Expand 5 - Machinery and Equipment5 - Machinery and Equipment
Collapse 6 - Pipework6 - Pipework
1 - Plan showing section through Oil Rectifier
2 - Piping Sections and Details Between Elevations - 58.000 and -72.000
3 - Pressure Relief Line
4 - Pressure Relief Line
5 - Piping Plan and Sections. Modification to H.P Choke. Manifold. M.12 Drill Floor
6 - Piping Plan and Sections - Fuel Gas Vent to H.P. Flare
7 - Fuel Gas from FG50.083 to V 4001
8 - Piping Plan and Details For Proposed Modification to Level Switch 13 LSHH 1008 on C.1301 (M.06 Deck)
9 - Piping Plan and Details For Proposed Modification to Level Switch 13 LSHH 1054 on C.1302 (M 06. Deck)
10 - Composite Isometric 16" Murchison Oil Export Line at Dunlin, 24" Oil Export from Dunlin to Cormorant
11 - Piping Plan and Details for Modification to Existing Line No's. 3"-WJ-31. 385-AN-0 and 2"-WP-10. 138-AA-0
12 - Preliminary Piping Plan and Sections 10" Blowdown Line from Main Gas Export Line to Flare Drum
13 - Piping Plan and Sections. Modification to Existing Sprinkler System. M.15 Roof
14 - Pipeline PG13011AC5
15 - Subsea Satellite Well Locations and Flowlines
16 - Subsea Satellite Well Locations and Flowlines
17 - Flowlines - As Built - Plot Plan
18 - Plan of Pipeline WA30128EA0 [Unit M6] with reference to Chemical Flush Point and Titanium Spool
19 - Plan of Pipework for Module/Area M10
20 - Plan of pipework showing drain run and inlet lube oil exchange for module/area 'Diesel M10'
21 - Substructure Piping Arrangement - Lower Mezzanine Floor
22 - Gas Lift to M15/04
23 - Composite Isometric - Utilise D-7506 For H2S Scavenger
24 - Separators Jetwash Upgrade - Pipe Support Schedule
25 - Piping Plan - Line No. 3"-WJ-31
26 - Piping Schedule
27 - Part Site Run
Expand 7 - Potable Water Storage and Water Purification7 - Potable Water Storage and Water Purification
Expand 8 - Power and Cabling8 - Power and Cabling
Expand 9 - Production9 - Production
Expand 10 - Structural Drawings10 - Structural Drawings
Expand 3 - Operations and Production3 - Operations and Production
Expand 4 - Health, Safety and Environment4 - Health, Safety and Environment
Expand 5 - Decommissioning5 - Decommissioning