Homepage
Home
Advanced Search
Contact Us
Help
Hierarchy Browser
MS 4022 - Murchison North Sea Oil Field papers
1 - Management and Administration
2 - Engineering and Construction
1 - Engineering and Construction: Pre-installation Studies and Reports
2 - Engineering and Construction: Installation Manuals and Procedures
3 - Engineering and Construction: Engineering Specifications
4 - Engineering and Construction: Engineering Reports and Manuals
5 - Engineering and Construction: Photographs
6 - Plans and Drawings
1 - Accommodation Modules
2 - Drilling
3 - Health and Safety
4 - Heating and Ventilation
5 - Machinery and Equipment
6 - Pipework
7 - Potable Water Storage and Water Purification
8 - Power and Cabling
9 - Production
1 - Gas Compression
2 - Oil Production
1 - One First Stage Separator Item No. C-1001 General Arrangement
2 - Details of Vortex Breakers and Baffle Plates
3 - Details of Saddles, Davits, Inlet and Name Plate For One Test Separator
4 - First Stage Separator
5 - Second Stage Separator
6 - Dual Sandwasher - Model 300 Complete with Fume Seals and Liquid-Gas Degasser (Sheet 2 of 2)
7 - Typical Connection Details - Desanding/Sandwashing Facilities
8 - Inlet Diverter and Pall Ring Frame
9 - Details of Existing Diverter Dish and Supports on Separator C-1003 (Module M4)
10 - Deluge Line to Inert Gas Converter (Module 08)
11 - Sea Water Washdown
12 - Murchison Cold Gas Venting Facility - Process Flow Diagram
13 - Gas Chiller
14 - 10-P-1482 Production Wellhead Y-1022 - Pressure - M51/13
15 - 10-P-1029 Production Wellhead Y-1003 - Pressure - M48/07
3 - Produced Water Handling
4 - Chemical Injection
10 - Structural Drawings
3 - Operations and Production
4 - Health, Safety and Environment
5 - Decommissioning
Useful Links
Museum Collections Catalogue
Collections Research Room
University Collections