Homepage
Home
Advanced Search
Contact Us
Help
Hierarchy Browser
MS 4022 - Murchison North Sea Oil Field: papers
1 - Management and Administration
2 - Engineering and Construction
1 - Engineering and Construction: Pre-installation Studies and Reports
2 - Engineering and Construction: Installation Manuals and Procedures
3 - Engineering and Construction: Engineering Specifications
4 - Engineering and Construction: Engineering Reports and Manuals
5 - Engineering and Construction: Photographs
6 - Plans and Drawings
1 - Accommodation Modules
1 - Canteen and Kitchens
2 - Plot Plan - 1st Module Level
3 - Drilling Modules and Substructure Area
4 - Section Plan: 'Portable…Roof…'
5 - Murchison Platform - M17. Module Type A. Cabin / Cabin Layout and Ceiling Plan
6 - Module Type A - Cabin/Cabin Sections
7 - Murchison Platform - M17. Module Type B. Cabin / Locker Room. Layout and Ceiling Plan
8 - Murchison Platform M17 - Module Type C - Stair / Locker Room Level 1. Layout and Ceiling Plan
9 - Murchison Platform M17 - Module Type B - Cabin / Locker Room. Sections
10 - Murchison Platform - M17 - Overall Module M17 Plan - Level 1
11 - Murchison Platform M17 - HVAC Plant Room (Module Types F) - G.A.
12 - Murchison Platform M17 - HVAC Plant Room (Module Types F). Sections
13 - Murchison Platform - M17 - Module Type E2 - Services Duct - Level 2 - HVAC Details
14 - Murchison Platform - M17 - Module Type E1 - Services Duct - Level 1 - HVAC Details
15 - Murchison Platform - M17 - Module Type D - Stair / Cabin - HVAC Details
16 - Murchison Platform - M17 - Module Type C - Stair / Locker Room - HVAC Details
17 - Murchison Platform - M17 - Module Type B - Cabin / Locker Room - HVAC Details
18 - Murchison Platform - M17 - Module Type A2 - Cabin / Cabin - HVAC Details
19 - Murchison Platform - M17 - Module Type A1 - Cabin / Cabin - HVAC Details
20 - Murchison Platform - Details of New Removable Handrailing - South Walkways of Modules M2 & M3
21 - Murchison Topside Facilities - Living Accommodation - Layout of HVAC Services Level 1 - Module 16
22 - Furniture Details - Reception Area - Murchison
23 - Murchison Topside Facilities - Living Accommodation - Arrangement and Details of HVAC Ductwork Module - 15 - Level 2
24 - Layout of HVAC Services for Module M15 Level 3
25 - Utilities Module M9 - Mezz Level - General Arrangement of Fire Detection Equipment
26 - Murchison Field - Substructure Cable Tray Layout
2 - Drilling
3 - Health and Safety
4 - Heating and Ventilation
5 - Machinery and Equipment
6 - Pipework
7 - Potable Water Storage and Water Purification
8 - Power and Cabling
9 - Production
10 - Structural Drawings
3 - Operations and Production
4 - Health, Safety and Environment
5 - Decommissioning
Useful Links
Museum Collections Catalogue
Collections Research Room
University Collections