Hierarchy Browser

Skip Navigation Links.
Collapse MS 3801 - TOTAL E&P UK: MCP-01 platform, Frigg Transportation System and St Fergus papersMS 3801 - TOTAL E&P UK: MCP-01 platform, Frigg Transportation System and St Fergus papers
Collapse 1 - MCP-011 - MCP-01
Expand 1 - Management & Administration1 - Management & Administration
Expand 2 - Health Safety & Environment2 - Health Safety & Environment
Expand 3 - Engineering & Construction3 - Engineering & Construction
Collapse 4 - Operations4 - Operations
Collapse 1 - Marine & Structure1 - Marine & Structure
1 - Asbestos Survey of MCP-01
2 - 2002 Atmospheric Inspection Report
3 - 2000 Atmospheric Inspection Report
4 - 2000 ROV Inspection Workbook
5 - 5 Year Inspection Plan 1995 - 1999
6 - Specification for inspection of Frigg MCP01 Structure
7 - MCP-01: 1987 - 1991 Specification for inspection of Concrete Structure
8 - Specification for Inspection of Frigg MCP01 Structure
9 - Summary of Results obtained in Annual/Major Survey for 1979
10 - Comments on the 1979 Air Diving Inspection
11 - MCP 01. Comments on the Unmanned Submersible Inspection Performed in 1979
12 - 1979 Structural Survey of MCP 01 Air Diving Inspection by Comex Diving Ltd. Report on Onshore Operations from 11th July to 12th August 1979
13 - Status Report for 1979
14 - MCP-01 1985 Air Diving Inspection Occidental Riser
15 - Appraisal of the 1985 MCP-01 Inspection Programme for the External 18 Inch Riser Structure
16 - Appraisal of the 1982 - 1985 MCP-01 Inspection Results for the External 18 inch Riser and Support Structure
17 - Appraisal of the 1985 MCP-01 ROV Inspection Programme for the Primary Concrete Structure
18 - Appraisal of the 1985 MCP-01 Air Diving Inspection Programme for the Primary Concrete Structure
19 - Appraisal of the 1985 MCP-01 Saturation Diving Inspection Programme for the Primary Concrete Structure
20 - MCP-01 Concrete Structure Assessment of Current Condition and Recommendations for Monitoring and Repair
21 - MCP-01 Atmospheric Inspection Reports Primary Concrete Structure Report 1985 Inspection Year Book
22 - 1985 Status Report for the Primary Concrete Structure (including 1981 - 1986 review)
23 - Frigg to St Fergus Gas Pipelines Occidental Riser at MCP-01 Inspection Report 1985
24 - Underwater Inspection Report Foundations 1979 Structural Survey of MCP01 (Manned Submersible)
25 - Underwater Inspection Report Primary Structure 1979 Structural Survey of MCP01 by Manned Submersible
26 - Structural Survey of MCP-01 Unmanned Submersible Inspection by RCV 225 Report of Offshore Operations from 2nd May, 1979 to 22nd May 1979
27 - Comments on the 1979 Manned Submersible Inspection Primary Structure and Foundations.
28 - MCP01 RCV Inspection 1979
29 - Atmospheric Inspection and Repairs
30 - Valve Replacement on MCP01
31 - Report on the Mid-Water Lock-On Trials by VOL's Diver Lockout Submersible L1 on Total Oil Marine Structure MCP01
32 - Underwater Inspection Report 1978 Structural Survey of MCP 01
33 - 1978 Underwater Survey of MCP-01
34 - 1979 Survey of MCP-01
Expand 5 - Cessation Project5 - Cessation Project
Expand 2 - St Fergus2 - St Fergus
Expand 3 - Frigg Transportation System3 - Frigg Transportation System
Expand 4 - TOTAL Publications4 - TOTAL Publications
Expand 5 - Oral History Recordings5 - Oral History Recordings