Homepage
  • Home
  • Advanced Search
  • Contact Us
  • Help

Hierarchy Browser

  •   MS 3801 - TOTAL E&P UK: MCP-01 platform, Frigg Transportation System and St Fergus papers
    •   1 - MCP-01
    •   2 - St Fergus
    •   3 - Frigg Transportation System
      •   1 - Management & Administration
      •   2 - Engineering & Construction
      •   3 - Safety & Inspection
        • 1 - Frigg Transportation Emergency Procedures Manual
        • 2 - Pipeline Emergency Shutdown Study
        • 3 - Frigg Pipeline System Emergency Intervention Plan from Pk0.2 to the Frigg Field
        • 4 - Major Accident Prevention Document
        • 5 - Line 2 Pigging Programme
        • 6 - Pipeline Inspection Programme
        • 7 - Frigg Transportation System: Emergency Procedure Manual Volume IV
        • 8 - Photographs of Pigs
        • 9 - Frigg-Scotland Pipelines Review of Soil Conditions and Recommendations for 1980 Soil Investigation
        • 10 - Pipeline Repair Procedures
        • 18 - Frigg Lines 1 & 2, St Fergus Gas Terminal & MCP-01 Inspection Report 1995
        • 21 - Piper Alpha reports
        • 22 - Yearly Environmental Condition Along the Frigg Pipelines Route from June 1976 to June 1982
        •   23 - Inspection Survey Results
        • 24 - The Glenn Report (Meteorological and Oceanographic Conditions along Pipe Route Frigg / St Fergus)
        • 25 - Frigg Pipelines Numbers 1 and 2 Inspection Philosophy
        • 26 - British Gas Internal Inspection Reports Frigg to St Fergus 32" Pipeline
        • 27 - 1984 Frigg Pipelines Status Report
        • 28 - 1979 Frigg Pipeline 1 Status Report
        • 29 - 32" Frigg Pipeline System Recertification Report
        • 30 - Line 2 Pigging Programme November 1999
    •   4 - TOTAL Publications
    •   5 - Oral History Recordings

Useful Links

Museum Collections CatalogueCollections Research RoomUniversity Collections
  • Privacy
  • Help
facebooktwitterinstagramwordpress

University Collections, University of Aberdeen

© CalmView