Hierarchy Browser

Skip Navigation Links.
Collapse MS 4022 - Murchison North Sea Oil Field papersMS 4022 - Murchison North Sea Oil Field papers
Expand 1 - Management and Administration1 - Management and Administration
Expand 2 - Engineering and Construction2 - Engineering and Construction
Collapse 3 - Operations and Production3 - Operations and Production
Expand 1 - Operation and Training Manuals1 - Operation and Training Manuals
Expand 2 - Operations and Production: Official Platform Logbooks2 - Operations and Production: Official Platform Logbooks
Expand 3 - Operations and Production: Offshore Installation Manager (OIM) Diaries3 - Operations and Production: Offshore Installation Manager (OIM) Diaries
Collapse 4 - Northern Leg Gas Pipeline: Handover Documentation4 - Northern Leg Gas Pipeline: Handover Documentation
1 - Manual 0 - Volume A Index to Manuals
2 - Manual 1 Project Requirements - Volume B Minutes of Management Committee Meetings
3 - Manual 2 System Design - Volume A Project Description Design Criteria and Related Studies
4 - Manual 2 System Design - Volume B Specific Pipeline Studies and Calculations
5 - Manual 2 System Design - Volume C Valve and Tee Protection Covers and Workover Frame Designs
6 - Manual 2 System Design - Volume D Minutes of Technical Sub-Committee Meetings
7 - Manual 3 Specifications - Volume A Design and Engineering Specifications
8 - Manual 3 Specifications - Volume B Construction and Installation Procedures
9 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.4 As-Laid Video Survey: Catalogue of Video Tapes
10 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.A.2 Pipelay Procedures Volume 1
11 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.A.3 As-Built Pipeline Installation Reports Volume 1
12 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.B.2 Pipelay Procedures Volume 2
13 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.B.3 As-Built Pipeline Installation Reports Volume 2
14 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.C.2 Pipelay Procedures Volume 3
15 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.C.3 As-Built Pipeline Installation Reports Volume 3
16 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.D.2 Pipelay Procedures Volume 4
17 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.D.3 As-Built Pipeline Installation Reports Volume 4
18 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.E.3 As-Built Pipeline Installation Reports Volume 5
19 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.F.3 As-Built Pipeline Installation Reports Volume 6
20 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.G.3 As-Built Pipeline Installation Reports Volume 7
21 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.H.3 As-Built Pipeline Installation Reports Volume 8
22 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.I.3 As-Built Pipeline Installation Reports Volume 9
23 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.J.3 As-Built Pipeline Installation Reports Volume 10
24 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.K.3 As-Built Pipeline Installation Reports Volume 11
25 - Manual 5 Pipeline Installation Procedures and Reports - Book 5.L.3 As-Built Pipeline Installation Reports Volume 12
26 - Manual 6 Quality Assurance - Book 6.1 Index to Manual 6
27 - Manual 10 Maintenance - Volume A
28 - Manual 10 Maintenance - Volume B
29 - Manual 10 Maintenance - Volume C 20 Inch Pipeline Repair at Magnus As Built Report
30 - Manual 11 Operating Procedures
31 - Manual 12 Technical Reports - Volume A Pipeline and Offshore Surveys
32 - Manual 12 Technical Reports - Volume B Post Trenching Plough for 6 Inch Diameter Pipeline Between Thistle A and Murchison
33 - Manual 12 Technical Reports - Volume C Design Investigation and Trials Reports
34 - Manual 12 Technical Reports - Volume D Pipeline Cathodic Protection
35 - Manual 12 Technical Reports - Volume E Valve Control System
36 - Manual 12 Technical Reports - Volume F Pre-Commissioning and Preliminary Commissioning Studies
37 - Manual 13 Photographs, Video and Photographic Records of Subsea Surveys - Volume A Photographs of Models and Equipment During Fabrication
38 - Manual 13 Photographs, Video and Photographic Records of Subsea Surveys - Volume A Subsea Photographs of Pipeline Installations
39 - Manual 14 As Built - Volume A Drawings and Documents
40 - Manual 14 As Built - Volume B Drawings and Documents: Subsea Survey General Report
41 - Manual 14 As Built - Volume C Drawings and Documents: Subsea Survey Appendices
42 - Manual 14 As Built - Volume D Drawings and Documents: Subsea Survey Still Photographs
43 - Manual 14 As Built - Volume E Drawings and Documents: Subsea Survey Charts
44 - Manual 14 As Built - Volume F Drawings and Documents: Trenching Records of 6 Inch NLGP
45 - Manual 15 Safety Audit
46 - Manual 16 Procurement - Volume A Purchase Orders
47 - Manual 16 Procurement - Volume B Purchase Orders Spares and Sub Orders
48 - Manual 16 Procurement - Volume C Engineering Contracts Service Contracts and Service Orders
Expand 4 - Health, Safety and Environment4 - Health, Safety and Environment
Expand 5 - Decommissioning5 - Decommissioning