Homepage
Home
Advanced Search
Contact Us
Help
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
MS 4022 - Murchison North Sea Oil Field papers
1 - Management and Administration
2 - Engineering and Construction
1 - Engineering and Construction: Pre-installation Studies and Reports
2 - Engineering and Construction: Installation Manuals and Procedures
3 - Engineering and Construction: Engineering Specifications
4 - Engineering and Construction: Engineering Reports and Manuals
5 - Engineering and Construction: Photographs
6 - Plans and Drawings
1 - Accommodation Modules
2 - Drilling
3 - Health and Safety
4 - Heating and Ventilation
5 - Machinery and Equipment
6 - Pipework
7 - Potable Water Storage and Water Purification
8 - Power and Cabling
9 - Production
1 - Gas Compression
2 - Oil Production
3 - Produced Water Handling
4 - Chemical Injection
1 - Details of P.S.1 For 4-inch Supply and Return Biocide Lines to Leg E6
2 - Detail of P.S. 2 for 4" Supply and Return Biocide Lines to Leg E.6
3 - 4 Inch Supply and Return Biocide Lines to Leg E.6
4 - Piping [Arrangement and Detail] - Chemical Injection Line for Well No.21
5 - Instrument Hook-Up - Existing Chemical Injection Skid and Pump
10 - Structural Drawings
3 - Operations and Production
4 - Health, Safety and Environment
5 - Decommissioning
Useful Links
Collections Research Room
University Collections