Homepage
Home
Advanced Search
Contact Us
Help
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
MS 4022 - Murchison North Sea Oil Field papers
1 - Management and Administration
2 - Engineering and Construction
1 - Engineering and Construction: Pre-installation Studies and Reports
2 - Engineering and Construction: Installation Manuals and Procedures
3 - Engineering and Construction: Engineering Specifications
4 - Engineering and Construction: Engineering Reports and Manuals
5 - Engineering and Construction: Photographs
6 - Plans and Drawings
1 - Accommodation Modules
2 - Drilling
3 - Health and Safety
4 - Heating and Ventilation
5 - Machinery and Equipment
6 - Pipework
1 - Plan showing section through Oil Rectifier
2 - Piping Sections and Details Between Elevations - 58.000 and -72.000
3 - Pressure Relief Line
4 - Pressure Relief Line
5 - Piping Plan and Sections. Modification to H.P Choke. Manifold. M.12 Drill Floor
6 - Piping Plan and Sections - Fuel Gas Vent to H.P. Flare
7 - Fuel Gas from FG50.083 to V 4001
8 - Piping Plan and Details For Proposed Modification to Level Switch 13 LSHH 1008 on C.1301 (M.06 Deck)
9 - Piping Plan and Details For Proposed Modification to Level Switch 13 LSHH 1054 on C.1302 (M 06. Deck)
10 - Composite Isometric 16" Murchison Oil Export Line at Dunlin, 24" Oil Export from Dunlin to Cormorant
11 - Piping Plan and Details for Modification to Existing Line No's. 3"-WJ-31. 385-AN-0 and 2"-WP-10. 138-AA-0
12 - Preliminary Piping Plan and Sections 10" Blowdown Line from Main Gas Export Line to Flare Drum
13 - Piping Plan and Sections. Modification to Existing Sprinkler System. M.15 Roof
14 - Pipeline PG13011AC5
15 - Subsea Satellite Well Locations and Flowlines
16 - Subsea Satellite Well Locations and Flowlines
17 - Flowlines - As Built - Plot Plan
18 - Plan of Pipeline WA30128EA0 [Unit M6] with reference to Chemical Flush Point and Titanium Spool
19 - Plan of Pipework for Module/Area M10
20 - Plan of pipework showing drain run and inlet lube oil exchange for module/area 'Diesel M10'
21 - Substructure Piping Arrangement - Lower Mezzanine Floor
22 - Gas Lift to M15/04
23 - Composite Isometric - Utilise D-7506 For H2S Scavenger
24 - Separators Jetwash Upgrade - Pipe Support Schedule
25 - Piping Plan - Line No. 3"-WJ-31
26 - Piping Schedule
27 - Part Site Run
7 - Potable Water Storage and Water Purification
8 - Power and Cabling
9 - Production
10 - Structural Drawings
3 - Operations and Production
4 - Health, Safety and Environment
5 - Decommissioning
Useful Links
Collections Research Room
University Collections