Homepage
Home
Advanced Search
Contact Us
Help
Record
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
MS 4022 - Murchison North Sea Oil Field papers
1 - Management and Administration
2 - Engineering and Construction
1 - Engineering and Construction: Pre-installation Studies and Reports
2 - Engineering and Construction: Installation Manuals and Procedures
3 - Engineering and Construction: Engineering Specifications
4 - Engineering and Construction: Engineering Reports and Manuals
5 - Engineering and Construction: Photographs
6 - Plans and Drawings
1 - Accommodation Modules
1 - Canteen and Kitchens
2 - Plot Plan - 1st Module Level
3 - Drilling Modules and Substructure Area
4 - Section Plan: 'Portable…Roof…'
5 - Murchison Platform - M17. Module Type A. Cabin / Cabin Layout and Ceiling Plan
6 - Module Type A - Cabin/Cabin Sections
7 - Murchison Platform - M17. Module Type B. Cabin / Locker Room. Layout and Ceiling Plan
8 - Murchison Platform M17 - Module Type C - Stair / Locker Room Level 1. Layout and Ceiling Plan
9 - Murchison Platform M17 - Module Type B - Cabin / Locker Room. Sections
10 - Murchison Platform - M17 - Overall Module M17 Plan - Level 1
11 - Murchison Platform M17 - HVAC Plant Room (Module Types F) - G.A.
12 - Murchison Platform M17 - HVAC Plant Room (Module Types F). Sections
13 - Murchison Platform - M17 - Module Type E2 - Services Duct - Level 2 - HVAC Details
14 - Murchison Platform - M17 - Module Type E1 - Services Duct - Level 1 - HVAC Details
15 - Murchison Platform - M17 - Module Type D - Stair / Cabin - HVAC Details
16 - Murchison Platform - M17 - Module Type C - Stair / Locker Room - HVAC Details
17 - Murchison Platform - M17 - Module Type B - Cabin / Locker Room - HVAC Details
18 - Murchison Platform - M17 - Module Type A2 - Cabin / Cabin - HVAC Details
19 - Murchison Platform - M17 - Module Type A1 - Cabin / Cabin - HVAC Details
20 - Murchison Platform - Details of New Removable Handrailing - South Walkways of Modules M2 & M3
21 - Murchison Topside Facilities - Living Accommodation - Layout of HVAC Services Level 1 - Module 16
22 - Furniture Details - Reception Area - Murchison
23 - Murchison Topside Facilities - Living Accommodation - Arrangement and Details of HVAC Ductwork Module - 15 - Level 2
24 - Layout of HVAC Services for Module M15 Level 3
25 - Utilities Module M9 - Mezz Level - General Arrangement of Fire Detection Equipment
26 - Murchison Field - Substructure Cable Tray Layout
2 - Drilling
3 - Health and Safety
4 - Heating and Ventilation
5 - Machinery and Equipment
6 - Pipework
7 - Potable Water Storage and Water Purification
8 - Power and Cabling
9 - Production
10 - Structural Drawings
3 - Operations and Production
4 - Health, Safety and Environment
5 - Decommissioning
Useful Links
Collections Research Room
University Collections