Homepage
Home
Advanced Search
Contact Us
Help
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
MS 3801 - TOTAL E&P UK: MCP-01 platform, Frigg Transportation System and St Fergus papers
1 - MCP-01
2 - St Fergus
3 - Frigg Transportation System
1 - Management & Administration
2 - Engineering & Construction
3 - Safety & Inspection
1 - Frigg Transportation Emergency Procedures Manual
2 - Pipeline Emergency Shutdown Study
3 - Frigg Pipeline System Emergency Intervention Plan from Pk0.2 to the Frigg Field
4 - Major Accident Prevention Document
5 - Line 2 Pigging Programme
6 - Pipeline Inspection Programme
7 - Frigg Transportation System: Emergency Procedure Manual Volume IV
8 - Photographs of Pigs
9 - Frigg-Scotland Pipelines Review of Soil Conditions and Recommendations for 1980 Soil Investigation
10 - Pipeline Repair Procedures
18 - Frigg Lines 1 & 2, St Fergus Gas Terminal & MCP-01 Inspection Report 1995
21 - Piper Alpha reports
22 - Yearly Environmental Condition Along the Frigg Pipelines Route from June 1976 to June 1982
23 - Inspection Survey Results
24 - The Glenn Report (Meteorological and Oceanographic Conditions along Pipe Route Frigg / St Fergus)
25 - Frigg Pipelines Numbers 1 and 2 Inspection Philosophy
26 - British Gas Internal Inspection Reports Frigg to St Fergus 32" Pipeline
27 - 1984 Frigg Pipelines Status Report
28 - 1979 Frigg Pipeline 1 Status Report
29 - 32" Frigg Pipeline System Recertification Report
30 - Line 2 Pigging Programme November 1999
4 - TOTAL Publications
5 - Oral History Recordings
Useful Links
Museum Collections Catalogue
Collections Research Room
University Collections