MS 3801 - TOTAL E&P UK: MCP-01 platform, Frigg Transportation System and St Fergus papers
1 - MCP-01
2 - St Fergus
3 - Frigg Transportation System
1 - Management & Administration
2 - Engineering & Construction
1 - Frigg Department Construction Pipeline: Rapport des travaux sur les differentes saisons
2 - Design Fabrication and Installation Resume, 32" Frigg Scotland Pipeline No. 2
3 - Frigg Field Project. Design Manual Volume 2: Pipeline. Book 1: Engineering Design.
4 - Frigg Field Project. Design Manual Volume 2: Pipeline. Book 7: Lay Barges Field Book.
5 - Frigg Field Project. Design Manual Volume 2: Pipeline. Book 16: Hydrostatic Tests and Pull-In Report
6 - Frigg Field Project. Design Manual Volume 2: Pipeline. Book 15: Submersibles.
7 - Preliminary Pipeline Routes from Frigg to Scotland, Norway, Shetlands and Denmark
8 - Frigg Pipelines Study Feasibility Study Report
9 - Application of Frigg Hyperbaric Welding Procedures at Depths Lower than 90m and for Heavier Thickness
10 - Frigg UK Pipeline Intervention
11 - Frigg to St Fergus Pipeline Project Submersible Season Report
12 - Frigg Bypass Decision Model: Internal Inspection Strategy
13 - Laying the Frigg Pipeline
14 - 1976 Flooding Report by Bar 323
15 - Survey Report on the 1977 Season Frigg Project
17 - Survey Report for Frigg Field to St Fergus Submarine Pipeline Number 2
18 - 'Pipeline Internal Inspection using an Instrumented Pig' Presentation
3 - Safety & Inspection
4 - TOTAL Publications
5 - Oral History Recordings