CollectionGB 0231 University of Aberdeen, Special Collections
LevelItem
Ref NoMS 4022/2/2/2
Alt Ref NoCNR070897
TitleLoadout Procedure for Murchison Platform
DateMarch 1978
Extent1 volume
Creator NameMcDermott Scotland
DescriptionProcedure document for preparing for and carrying out the loadout of the Murchison platform's steel jacket structure from the McDermott construction yard at Ardersier onto the heavy lift barge that was to then transport it to the Murchison field in the North Sea. The document describes in detail the engineering works, specifications and calculations involved in the loadout, with various drawings and diagrams included as appendices, some as size A1.
Access StatusOpen
Add to My Items