Description | Procedure document for preparing for and carrying out the loadout of the Murchison platform's steel jacket structure from the McDermott construction yard at Ardersier onto the heavy lift barge that was to then transport it to the Murchison field in the North Sea. The document describes in detail the engineering works, specifications and calculations involved in the loadout, with various drawings and diagrams included as appendices, some as size A1. |