Description | Detailed study of the stability of the Murchison tower at 42 stages of offshore installation, to aid in establishing an installation sequence and to evaluate stability of the upended tower prior to piling and during piling, concluding that the structure has very good stability which enables flexibility in determining the installation sequence. |