Description | Image 1- Colour photograph showing the installation of the Permanent Living Quarters on MCP-01. Shows whole of MCP-01 from a distance with the PLQ being lifted with the arm of a crane. Dated 10 July 1982. Image 2 - Colour photograph of the PLQ being towed by a tug boat through Lowestoft Harbour, with the construction yard in the background. Dated 2 July 1982. Image 3 - Three colour photograph of the installation of the temporary crane on board MCP-01. Two of the photographs show the temporary crane being lifted on board the platform by a larger crane, probably at dawn; the other shows the crane sitting on the barge in darkness. Image 4 -Colour photograph showing the temporary living quarters being lifted aboard MCP-01.Shows the whole platform and the crane from a distance . Dated 18 May 1981. Image 5 - Colour photograph of the valve skid being lifted onto MCP-01. Taken from the platform, showing the valve skid in the foreground and the crane barge in the background. Image 6 - Close-up colour photograph of the valve manifold skid being lowered onto MCP-01, with the deck below. Dated 25 December 1982. Image 7 - Colour photograph of the West side of compression module 11. Shows the platform's identification sign. Taken from below, looking almost vertically up. Image 8 - Colour photograph of the exterior of compression module M11, South side of Level D. Taken at a slightly diagonal angle. Image 9 - Colour photograph of two abseillers carrying out repair works to the blast wall of compressor M11. Dated 2002. Image 10 - Colour photograph of the whole exterior of compression module M12, South side of Level D. Image 11 - Colour photograph of the exterior of compression module 12, South end. The module is in the background, with a guardrail and pipework in the foreground. Image 12 - Black and white layout plan of compression module 11, showing the levels A to D and the roof level. Image 13 - Black and white layout plan of compression module 12, showing levels A to D and the roof level. |