| Collection | GB 0231 University of Aberdeen, Special Collections |
| Level | Item |
| Ref No | MS 3801/3/2/6 |
| Alt Ref No | 015359 |
| Title | Frigg Field Project. Design Manual Volume 2: Pipeline. Book 15: Submersibles. |
| Date | 1976 - 1977 |
| Extent | 1 volume |
| Creator Name | Total Exploration Production Groupe Pipelines Marins. |
| Description | Apart from the introduction, the bulk of this book is extracted from the 'Submersible Season Report - 1976', comprising chapters on technical specifications; pipeline inspection; buoy release; MCP-01 site clearance; pull-in operation assistance; MCP-01 base inspection; pulling-head inspection; deep valley inspection; pipe buckle surveys; transponder launch and recovery; submersible performance; and conclusion. The logs, statistics and results from the work carried out are presented. With diagrams and charts. |
| Accruals | None expected. |
| Access Status | Restricted |
| Access Conditions | These records are subject to access restrictions. Please contact the Archivist for advice. Permission to make any published use of material from the collection must be sought in advance from the Head of Special Libraries and Archives and from the copyright owner. Responsibility for ensuring copyright clearance rests with the user of the material. |
| Physical Description | There are no physical conditions restricting access to this material. |