Collection | GB 0231 University of Aberdeen, Special Collections |
Level | Item |
Ref No | MS 4022/5/1/3/4 |
Alt Ref No | CNR002766 |
Title | North Sea Decommissioning Estimates - Phase 2 - Corrections to Report |
Date | August 1997 |
Extent | 1 volume |
Creator Name | Twachtman Snyder and Byrd Inc |
Description | Supplementary information to a report presenting the results of a platform decommissioning study and phase 2 cost estimates prepared for the then-operator Oryx. This volume includes detailed information on the report authors' proposed methods for each of five major decommissioning cost components, and a review of regulations applicable to North Sea platform decommissioning. |
Access Status | Open |