| Collection | GB 0231 University of Aberdeen, Special Collections |
| Level | Item |
| Ref No | MS 4022/3/4/5 |
| Alt Ref No | CNR077310 |
| Title | Manual 2 System Design - Volume C Valve and Tee Protection Covers and Workover Frame Designs |
| Date | 1 November 1983 |
| Extent | 1 volume |
| Creator Name | Britoil PLC |
| Description | Manual 2 of the Northern Leg Gas Pipeline (NLGP) Handover Documentation, covering System Design. Volume C contains Valve and Tee Protection Covers and Work-Over Frame Designs. |
| Access Status | Open |