Description | Manual 11 of the Northern Leg Gas Pipeline (NLGP) Handover Documentation, covering Operating Procedures. The manual includes a Certificate of Handover and Acceptance of the NLGP from Constructor to Operator, a Diagram of Limits of Operation, Terms of Reference of the Operations Work Group, and the minutes of Operations Work Group meetings. |