Description | Addendum to the manual for the installation of three flowlines for the Murchison field. The manual provides background information, guidelines and procedures for the tow-out, pull-in and connection of three flowline bundles from the fabrication site to the Murchison field. The addendum covers the alterations to the original procedures necessitated by the positioning of the flotel 'Borgland Dolphin' adjacent to the Murchison platform. |