| Description | Programme for tank trials, report on the testing and trials of the ADS 1971-1974. Notes regarding contacting suppliers to construct the ADS. Correspondence regarding: the Department of Trade and Industry; trials of the ADS; the display of the suit at an exhibition; and a submission for the MacRobert Award. Inter-office memoranda regarding the ADS's design and manufacture and DHB's relationship with UMEL. Operation reports for Retrosub, well head recovery work for Occidental and arctic trials of the JIM ADS by Can-Dive at Panarctic Oils Limited's Hecla M25 well. Operating procedure for the suit.
Management meetings in December 1974 and January 1975 and General Manager's Reports for April, May and July 1977. Copies of the memorandum and articles of association for DHB Construction, a special resolution altering the articles of association for DHB Construction (both 1969) and additional resolutions (1970).
5 draft agreements between DHB and Oceaneering, three relating to assigning the rights to market DHB's suits to the oil and gas industry and two relating the evaluation of the JIM suit for Oceaneering's customers, and two draft agreements between DHB and UMEL concerning technical cooperation between the companies (all unsigned, dated 1975).
Article titled 'Armoured suit has 1000ft capability' by Robert Barton in 'Offshore Services' May 1973, and 7 news cuttings from international newspapers about the suit. |