| Description | Digital copy of a presentation pack of a visit by representatives from Total to the construction site of the compressors on 4th January 1983. With an introductory page with basic details of the contract (parties, dates and one-sentence description), basic size and weight statistics of the compressors and a list of project milestones. The bulk of the pack is full colour A4 (or nearly A4) photographs, most with labels. Including the plating of the deck structure and truss construction in January 1982, the equipment installation in May 1982, installation of the pipework in September, and the loadout of the compression modules in December. There are also loose photographs tucked in, mostly group photos taken during the visit. |