Record

CollectionGB 0231 University of Aberdeen, Special Collections
LevelFile
Ref NoMS 3801/3/3/23/5
Alt Ref No018209; JMc/C.851.VC; L.1588F/00/AXM; 129861
Title1986 Pipeline Inspection Survey Report
Date1986
Extent2 volumes
Creator NameMobell Subsea Engineering, Surveying & Consultancy; Total
DescriptionReport of the acoustic landfall survey carried out in April 1986. Comprises the client's requirements; abstract; survey methods; results; and five appendices: control station co-ordinates, calibration details, instrumentation, personnel, and summary of events.

Also the 1986 Inspection Scheme for both pipelines, comprising sections entitled Introduction, Person responsible for the scheme, Inspection programme (subdivided into areas to be inspected along the whole length of the pipeline, from TP1/TCP2 to St Fergus Terminal), Remedial work, Modification work, and Time schedule.
AccrualsNone expected.
Access StatusRestricted
Access ConditionsSome material is restricted by TOTAL.
Physical DescriptionThere are no physical conditions affecting access to this material.
Add to My Items