Record

CollectionGB 0231 University of Aberdeen, Special Collections
LevelItem
Ref NoMS 3801/3/3/18
Alt Ref No106108
TitleFrigg Lines 1 & 2, St Fergus Gas Terminal & MCP-01 Inspection Report 1995
Date1995
Extent1 volume
Creator NameTotal
DescriptionCopies of individual inspection reports of the pig receivers, central core, riser and safety relief valve. Provides some general information of the equipment inspected, how the inspection was carried out, and a brief report of the findings. Where the inspection was not visual, e.g. ultrasonic thickness survey, details of the equipment used to carry out the inspection is given. Contains some diagrams and plans, usually showing positioning of weld or previous defect. There are colour photographs of the L 1502 Pig Receiver vent line before modification. All but one of the inspections were carried out by Total; that one was by Wood Group Engineering Services
AccrualsNone expected
Access StatusRestricted
Access ConditionsSome material is restricted by TOTAL.
Physical DescriptionThere are no physical conditions affecting access to this material.
Add to My Items