| Description | Quality control and inspection summary report on pipeline 2, running from TCP2 to St Fergus, via MCP-01. The phases covered are the design, fabrication, installation and testing (excluding drying and trenching) of the pipeline. Within those areas, the report specifically focussed on the standards, specifications, procedures and tests that should be complied with. The DFI is a Norwegian requirement and was carried out on behalf of the Norwegian Petroleum Directorate and Total Marine Norsk A/S. No DFI exists for the British pipeline 1. |