| Description | Short report on the technical aspects of the pipeline. Includes basic design data, pigging details including the operating procedures (with sketches), the rationale behind it and the amount of condensate expected, graphs of flow rates, pressure and velocities, and appendices on the experience of a similar pipeline in the Gulf of Mexico and a study determining the time of pressure equalization across the main line check valve at MCP-01. With annotations. |