| Description | Report of a joint Total Marine Norsk A/S and Statoil carried out between May 1987 and January 1988. Comprises an Introduction, Summary, Study basis, Description of the Frigg Transportation System, Gas flowrates and compositions, Evaluation of the Frigg Transportation System, Tie-in solutions, Fitness and life expectancy, System availability, Safety assessment, Pipeline standard pigging programme, Costs, Next phase - Future studies. With two appendices; the first being Total Frigg Pipelines Numbers 1 and 2 Inspection Philosophy, including descriptions of the pipeline components, proposed inspection scheme for each pipeline component and inspection scheme and proposed annual planning, and itself has an appendix; and the second appendix being Statoil's Evaluation of future use of the Frigg transportation system, including an introduction, bypass connection conceptual design, cost estimates and schedule, and a technical appendix that includes methodology, equipment and brochures for cold tapping, tie-ins and pigging . Some very minor annotation. |