| Description | A safety evaluation of the different disposal options for the topsides on MCP-01. Comprises an introduction, description of the structure (MCP-01's substructure), four different disposal options (leave in place, partial removal, total removal with offshore disposal, and total removal with onshore disposal), methodology of assessment (how the safety evaluation was performed), summary of accident data, discussion of work breakdown (review of time exposed to risks for each disposal option), results discussion (review of fatality and injury risks), references and an appendix of accident data. |