| Description | Report detailing what the visual inspection will involve and how it will be carried out. Comprises an introduction, scope of work, reporting and data recording, video requirements and two appendices of excerpts of the 1999 and 2000 subsea inspection work-scope, including locations drawings of existing anomalies. The inspection focussed on the subsea structure of MCP-01, the 18" Texaco Riser and 14" EESV Caisson.
The video footage accompanying the report is missing. |