| Description | The Remote Controlled Vehicle (RCV) inspection covered Cells B and C of the primary and secondary structure, the Occidental Riser from seabed to mean sea level, and the North part of the 32" pipeline. It was carried out by Wharton Williams Ltd. Comprises an Introduction; Summary of offshore operation, subdivided into general overview, telex reports, time breakdowns, personnel involved and recommendations; Summary of inspection work, subdivided into general overview, records, reports and recommendations; Conclusions; and References.
Most of the reports and telexes are photocopies of the originals (which were both handwritten and printed) and some of the text is faded. |