| Description | Engineering drawings for contract C5013/C5020. Plans, sections and elevations of alterations required as part of the installation of compression facilities on MCP-01, including those to all the major structures, and piping and electrical systems. Some of the drawings are of low quality and in relatively poor condition, with some pages loose. |