CollectionGB 0231 University of Aberdeen, Special Collections
LevelItem
Ref NoMS 3801/1/3/1/5
Alt Ref NoJob No. 78-5701
TitleIntermediate Manifold Platform Description of Facilities
DateJanuary 1976
Extent1 volume
DescriptionDocument describing the main features of MCP-01. It is not an operating or procedural manual. Comprises the following sections: Introduction; Frigg Field Development, with visual representations of the field and an outline of the scope of development of all platforms, the pipelines and shore terminal; and Intermediate Manifold Platform, describing the MCP-01 project including pictorial representations, the environmental and design data, plans and elevations, descriptions and drawings of the structures and equipment, and operating and safety provisions. Includes many engineering drawings, flow diagrams and schematics. Stamped 'Received 3 Jun 1980'.
Access StatusOpen
Add to My Items