Record

CollectionGB 0231 University of Aberdeen, Special Collections
LevelItem
Ref NoMS 3801/3/3/27
Alt Ref No129839
Title1984 Frigg Pipelines Status Report
Date1984
Extent1 volume
Creator NameGas Operation Division, Total Oil Marine plc
DescriptionComprises an Introduction; Inspection Scheme; Summary - Conclusion; TP1/TCP2 Risers and Manifolds; MCP-01 Risers and Manifolds; Submarine Pipelines; Landfall Acoustic Survey; St Fergus Terminal; Control Apparatus; Product and Corrosion Monitoring ; Free Span Reduction; eleven appendices with the same titles as the main chapters and providing supporting information. Some minor annotations.
AccrualsNone expected.
Access StatusRestricted
Access ConditionsSome material is restricted by TOTAL.
Physical DescriptionThere are no physical conditions affecting access to this material.
Add to My Items