| Collection | GB 0231 University of Aberdeen, Special Collections |
| Level | Item |
| Ref No | MS 3801/3/2/6 |
| Alt Ref No | 015359 |
| Title | Frigg Field Project. Design Manual Volume 2: Pipeline. Book 15: Submersibles. |
| Date | 1976 - 1977 |
| Extent | 1 volume |
| Creator Name | Total Exploration Production Groupe Pipelines Marins. |
| Description | Apart from the introduction, the bulk of this book is extracted from the 'Submersible Season Report - 1976', comprising chapters on technical specifications; pipeline inspection; buoy release; MCP-01 site clearance; pull-in operation assistance; MCP-01 base inspection; pulling-head inspection; deep valley inspection; pipe buckle surveys; transponder launch and recovery; submersible performance; and conclusion. The logs, statistics and results from the work carried out are presented. With diagrams and charts. |
| Accruals | None expected. |
| Access Status | Restricted |
| Access Conditions | Some material is restricted by TOTAL. |
| Physical Description | There are no physical conditions restricting access to this material. |