| Collection | GB 0231 University of Aberdeen, Special Collections |
| Level | File |
| Ref No | MS 3801/1/5/1/3 |
| Title | MCP-01 Disinvestment Phase II Study Report |
| Date | September 1995 |
| Extent | 2 volumes |
| Creator Name | Offshore Design Engineering |
| Description | Document No 3711-C-F-002. Study examines the options for disinvestment of the compression facilities in MCP-01, including introduction, scope, methodology and with Appendix A 'Drawings' containing engineering drawings and schematic diagrams of the platform and Appendix B 'Calculations' containing details of various calculations made in reaching the conclusions of the study. |
| Accruals | None expected. |
| Access Status | Restricted |
| Access Conditions | Some material is restricted by TOTAL. |
| Physical Description | There are no physical conditions restricting access to this material. |
| Related Material | MS 3801/1/5/1/4 |