| Description | Report of the 406-mile tow-out and installation of MCP-01 from Sweden to its position in the North Sea. Comprises Summary of Events, providing the dates and times of each operation; Requirements, stating the purpose of the operation; Pre-Location Survey, giving a brief overview of an earlier survey of the route and the laying of the transponders; Tow-Out, providing a recap of the operation; Final Positioning, detailing the final last six miles before MCP-01 was installed; Results, with analysis of the whole operation; Conclusions, with the focus on recommendations to improve procedures and equipment. With twelve enclosures, mostly lists or graphs of results, or charts marking positions. A R Townsend, Total Oil Marine Ltd |